Ascot Racecourse case study

Ascot Racecourse’s past can be dated back to 1711 and is famous for the five days of racing that make up Royal Ascot week.

The challenge

  • Future proof infrastructure
  • Meet the connectivity requirements for communications, broadcast media, IT and public safety
  • Scalable and resilient for both commercial and public safety reasons

The solution

  • 20% saved on the site wide cabling budget
  • Improved customer service and information access
  • Flexible, instantly deployed commercial facilities
  • Increased profitability for service partners
  • First racecourse globally with a single wireless solution covering the entire site

Why Redcentric

  • Demonstrated experience
  • In-depth consultation
ascot-racecourse-logo.png

Industry / Sector

Entertainment & Hospitality

Services

  • Design, cabling planning and installation
  • A single wireless solution
  • Functionality to manage the network on-site
  • 24/7 remote monitoring of the network
Download the Ascot case study